How it works

From your P6 file to your first agent run.

One workspace where you generate and diagnose in the same place, all governed by fixed rules. Talk to Nahla in plain English; the agents propose the changes, and you approve.

Step by step

Here is the whole path.

  1. 1
    Access

    Book a demo to get access.

    Access is arranged with us directly. We set up your workspace and walk through Nahla on your own programme, so you start on real data rather than a blank screen.

    • Secure sign-in, accounts set up by us
    • Your workspace configured with you
    • Enterprise access, arranged directly
  2. 2
    Start in chat

    Just ask. It routes to the right capability.

    Describe what you need in plain English and the right agent or skill answers, drafts or simulates, then hands you a proposal. Nothing touches your schedule or your subcontractors on its own.

    “Where will we finish at this rate?”→ Forecast
    “What if structure slips 10 days?”→ What-If Scenario
    “Run a DCMA 14-point check”→ Schedule Diagnostics
    See all 5 agents and the on-demand skills →
  3. 3
    Starting point

    Generate one, or import the one you have.

    Two ways in. Describe the project and let Nahla draft the schedule, or upload the schedule you already manage.

    Generate Generate from a brief

    Describe the project in plain English and Nahla drafts the whole programme: WBS, tasks, durations, dependencies and resources. You review and approve.

    • Plain-English schedule generator
    • Full Gantt with WBS & resources
    • CPM scheduling rules
    • P6- and MSP-ready export
    Upload Import an existing schedule

    Drop a P6 or MS Project file. We parse and validate the structure before anything else runs.

    • Primavera P6, MS Project, or zipped archive
    • Large schedules: Contractor up to 10,000 activities, Enterprise unlimited
    • Encrypted in transit and at rest
    • Delete anytime, including full history
  4. 4
    One workspace

    Diagnose, compare and edit, all in one canvas.

    Find any issue in the Diagnose view, compare against baseline or your last revision, then edit in Build with the AI proposing the changes. You approve, and it applies.

    Build · edit with AI Edit with AI

    Ask in plain English and the AI proposes the edits; you approve and they apply. Nothing changes on its own.

    • Plain-English edits, AI proposes
    • Level resources & run what-ifs
    • Approve, then it applies
    Diagnose · read-only Health check & compare

    Compare against baseline or your last revision to surface the riskiest deltas.

    • 14-point schedule quality check
    • Driving & near-critical path
    • Phase analysis & resource diagnostics
    • Baseline & revision comparison
  5. 5
    Ask

    Ask in plain English, anywhere on the canvas.

    Ask “what's slipping?”, “show critical path”, or “which five tasks have zero float?” Every answer is grounded in the schedule and the governance rules underneath.

    • A generous monthly query allowance, scaled by plan
    • Natural language across tasks, WBS, codes, dates, costs & risks
    • Charts appear as you ask
    • Pin any chart, then ask follow-ups on it
  6. 6
    Report

    Build a custom report as you go.

    Sections accumulate from the conversation. Add Executive Summary, Monthly, Weekly, Monte Carlo, or any pinned Q&A. Brand it, save as draft, set a project manager, then ship.

    • Sections accumulate from the AI conversation
    • Brand with your company logo (PNG / JPG)
    • Save as draft, edit later, version freely
    • Share a link: interactive charts and tables, no login for viewers
  7. 7
    Distribute

    Share, export, or take it with you.

    Send a link instead of a PDF: interactive charts, tabs and tables, no login required. Or export and walk away with everything.

    • Shared links: interactive, no viewer login, 30 days
    • P6- and MSP-ready export, plus CSV and PDF
    • One-click delete, your data leaves with you
Governance rules underneath

The agent asks. The rules answer.

The agents never work out a date themselves. They apply governance rules, such as the critical path method and DCMA-14, and that answer is the one you see.

CPM

When do we finish, and what is driving it?

Time impact

What does this delay do to completion?

DCMA-14

Is this schedule fit to report from?

Resource levelling

Can the crews we have actually do this?

Revision diff

What changed since the last update?

Progress verification

Does the reported progress add up?

Baseline comparison

How far are we from the baseline?

Monte Carlo

What range of finish dates is realistic?

Same file, same number, every time.

Ready to start?

A short call, and we will walk it through on your own programme.